HomeDocs-Technical WhitePaper12-EFT.WP.Methods.Repro v1.0

Chapter 13 Change Management and Version Strategy


I. Scope and Objectives


II. Terms and Symbols


III. Postulates and Minimal Equations

  1. P31-50 Compatibility corridor postulate
    With compatibility flags enabled and an agreed budget, the observable behavioral differences between the old and new implementations satisfy
    Pr( delta_rep <= b_rep ∧ delta_psd <= b_psd ∧ r_tb <= b_tb ∧ eps_mass <= b_mass ) → 1 as samples and windows become sufficient.
  2. P31-51 Rollback reachability postulate
    Any stable/LTS release must define an anchor and a rollback playbook such that rollback_to( anchor ) returns to an in-gate state in a finite number of steps.
  3. S32-60 Change-class criterion
    • class(change) = MAJOR iff schema_break ∨ api_break ∨ require_new_data ∨ require_new_EnvLock
    • class(change) = MINOR iff default_param_change ∨ perf_shift ∨ feature_add with no breaking semantics
    • else class(change) = PATCH.
  4. S32-61 Dual-run aggregate deltas
    • Delta_agg = ( Σ ( w_i * delta_rep_i ) ) / ( Σ w_i )
    • PSD_agg = ( Σ ( w_i * delta_psd_i ) ) / ( Σ w_i )
    • TB_agg = ( Σ ( w_i * r_tb_i ) ) / ( Σ w_i )
    • Pass condition: Delta_agg <= b_rep ∧ PSD_agg <= b_psd ∧ TB_agg <= b_tb.
  5. S32-62 Upgrade conservation & regression tolerance
    score_new - score_old >= -tau_reg and lower( CI_score_new ) >= tau_score; tau_reg per Chapter 12.
  6. S32-63 Deprecation-plan consistency
    For any deprecated item d, require ( T_dep - now ) >= T_grace and provide a flag-based transition compat flag(d) within W_mig.

IV. Data and Manifest Gauges


V. Algorithms and Implementation Bindings


VI. Metrology Flows and Run Graph

  1. Mx-35 classify-and-scope
    • Label change_type and impact surface (environment, data, algorithm, gauges).
    • Set budget and compat flags.
    • Emit MigPlan and the observation matrix (aligned to TS.*).
  2. Mx-36 dual-run-and-compare
    • Call I30-26 to obtain DiffMatrix.
    • Compute Delta_agg / PSD_agg / TB_agg and delta_form.
    • Trigger I30-27 for pass/fail and remediation guidance.
  3. Mx-37 decide-and-cutover
    • If evaluate_compat.pass = true and score_new meets gates, execute I30-28 with the chosen mode.
    • If some cases exceed budget but can be shielded via flags, enter shadow or canary to expand samples.
    • On failure, enter rollback and fix-iterate (I30-29).
  4. Mx-38 deprecate-and-archive
    • Publish T_dep / T_grace with migration guidance.
    • Register H_k on the Chapter 9 audit trail; archive CutoverReport, RollbackPlan, and CHANGELOG.
    • Update baselines and benchmark-suite mappings.

VII. Verification and Test Matrix

  1. Tiered verification
    • MAJOR: mandatory full dual-run; conservative budgets; must pass S32-61/62, with delta_form contribution within cap.
    • MINOR: sampled dual-run with full coverage of critical cases; allow positive perf_norm shifts backed by CI_score.
    • PATCH: minimal regression set plus audit-trail integrity checks.
  2. Boundary scenarios
    • Data-schema evolution: apply reversible operator Migrate(schema_v_old -> schema_v_new); verify idempotence and rollback.
    • Time-base gauge change: refit alpha, beta; report r_tb and its marginal impact on score.
    • Window & spectral-gauge switch: analyze sensitivity of delta_psd to changes in U_w / ENBW.
  3. Alerts and gate coupling
    • Hard gates: Delta_agg <= b_rep, PSD_agg <= b_psd, TB_agg <= b_tb, eps_mass <= b_mass.
    • Soft gates: lower( CI_score_new ) >= tau_score, score_new - score_old >= -tau_reg.

VIII. Cross-References and Dependencies

Chapter 4 data traceability with fingerprint / hash(•); Chapter 5 EnvLock; Chapter 7 card structures; Chapter 8 score synthesis; Chapter 9 release channels and audit chain; Chapter 12 acceptance gates and CI_score. Run-time observations follow Core.Threads TS.*.

IX. Risks, Limits, and Open Questions


X. Deliverables and Version Policy

  1. Deliverables
    • MigPlan (budget / W_mig / T_dep / T_grace / compat flags / anchor).
    • DiffMatrix and ScoreSummary(old,new).
    • CutoverReport, RollbackReport, and audit chain H_k / sig_k.
    • CHANGELOG (per-version deltas, impact surface, flags, window and gate updates).
    • Migration guide and rollback playbook.
  2. Version strategy
    • Events triggering MAJOR require a new LTS branch and freezing the prior LTS to security fixes only.
    • MINOR rides the canary → stable release train, keeping dual-run active within W_mig.
    • PATCH may go directly to stable, but must update CHANGELOG and anchor.
    • Every version is hardened with hash(•) and fingerprint, supporting long-term forensics and one-click rollback.

Copyright & License (CC BY 4.0)

Copyright: Unless otherwise noted, the copyright of “Energy Filament Theory” (text, charts, illustrations, symbols, and formulas) belongs to the author “Guanglin Tu”.
License: This work is licensed under the Creative Commons Attribution 4.0 International (CC BY 4.0). You may copy, redistribute, excerpt, adapt, and share for commercial or non‑commercial purposes with proper attribution.
Suggested attribution: Author: “Guanglin Tu”; Work: “Energy Filament Theory”; Source: energyfilament.org; License: CC BY 4.0.

First published: 2025-11-11|Current version:v5.1
License link:https://creativecommons.org/licenses/by/4.0/